| NRSWA
Details |
New
Roads and Street Works Act
Qualification of Supervisors and Operatives Regulations
1992
Details
of Requirements
There are 16 Units of competence as listed below:
Unit 1: Location and avoidance of underground apparatus.
Unit 2: Signing, lighting and guarding.
Unit 3: Excavation in the highway.
Unit 4: Reinstatement and compaction of backfill materials.
Unit 5: Reinstatement of sub-base and roadbase in non-bituminous materials.
Unit 6: Reinstatements of cold-lay bituminous materials.
Unit 7: Reinstatement of hot-lay bituminous materials.
Unit 8: Reinstatement of concrete slabs.
Unit 9: Reinstatement of modular surfaces and concrete footways.
Unit 10: Monitoring signing, lighting and guarding.
Unit 11: Monitoring excavation in the highway.
Unit 12: Monitoring reinstatement and compaction of backfill materials.
Unit 13: Monitoring reinstatement of sub-bas and roadbase in non-bituminous materials.
Unit 14: Monitoring reinstatement in bituminous materials.
Unit 15: Monitoring reinstatement of concrete slabs.
Unit 16: Monitoring reinstatement of modular surfaces and concrete footways.